PROJECT SUMMARY

  • Location

    London

  • Client

    Crossrail

  • Main Contractor

    Costain Skanska JV

  • Value

    £15m

  • Duration

    124 Weeks

  • Project

    Crossrail, Civils

PROJECT DETAILS

Eastern Ticket Hall Phase 1 is part of the Crossrail scheme along with the redevelopment of Bond Street tube station in the heart of London.


Works consisted the construction of the capping beams to the perimeter of the site plus two shafts dropping five storeys using top down construction.

Much of the works were constructed on a 24/7 programme basis with the requirement to fluctuate the labour dramatically to suit the needs of the programme and availability of work. Works commenced later than expected but at the end of the original programme the project was completed on time on budget.