Location
CB23 4WU
Client
Highways England
Main Contractor
IDT
Value
£9m
Duration
67 Weeks
Project
Civils, Highways
Kelly Formwork were a key supply chain partner to IDT in undertaking the £1.5bn scheme, which included a new by-pass and 21 miles of upgrades to the existing A14. Kelly formwork undertook the construction of a variety of reinforced concrete structures, across multiple sections of the project, and in some cases above live carriageways to minimise disruption to the travelling public. Structures included; 7 vehicle bridges; 2 pedestrian bridges; 53 sets of culvert headwalls; 66 Gantry Bases (Portal and Cantilevered); 18 CCTV Bases.
We are proud to have been an integral part of the first Considerate Constructor Ultra Site which will boost the local economy, reduce commuting times by 20 minutes whilst connecting local communities, and create a positive legacy for the region.